Humberstone Cloverfields Primary Academy

The brief

To provide a full turnkey new build solution to the school including removal of the existing buildings and foundations. The new building was to be much larger  with the scope to include design, manufacture and administration including hard paving and fencing.

The concept

The new early years building was required to provide three classrooms with a spacious and light environment for young children. The building was designed as  10 modules in a “T” shaped configuration to maximize external windows and doors to each classroom. The building was serviced by toilet facilities and incorporated a staff room.

The results

The new building provides a modern and much larger teaching facility allowing the Academy to meet the needs of increasing student numbers enrolling at the school with a contemporary learning environment.

If you are interested in knowing more about our schools please feel free to visit our sister site www.modular-classrooms.co.uk

Highlights

Location
Humberston Primary Academy

Turnkey Solution

With the requirement to remove existing buildings and foundations, Wintech worked in partnership with the client from the outset to provide a full turnkey service, from design to manufacture and installation.

Maximising Light and Access

Taking into account the constraints of the site footprint combined with the client requirements, a 'T' shaped configuration was designed and developed to maximise on light for each classroom, as well as independent access to each.